References

Here is a sampling of some of our notable projects:

Caterpillar Generators, Norcross Georgia

Prime installer for Yancy Power

Med Assets

  • Design and build data center including:
  • 250 KW generator back-up
  • 130 KVA UPS
  • 40 ton Liebert HVAC
  • Floor, ceiling and wall construction
  • Lighting
  • Fire Suppression

Clark Atlanta University Central Plant

  • Installation of a 4000A 480V service with 4 MCC's
  • Installation of 19KV electrode boiler
  • Installation of VFDs
  • Wiring of pumps, motors, and lighting

Lubrizol

  • Motor Control Cabinets
  • 750 KW Transformer
  • 15KV gear
  • 5KV gear
  • 500 hp motor at 4180V
  • Class II Div II equipment
  • Lighting
  • Instrumentation and Controls
  • Cable Tray Design

Amerimax

  • Engineered and performed the relocation of two machine shops & Data Center into one location
  • This project consisted of process injection molding equipment and metal stamping equipment and all data equipment including grounding and Cat 5 cabling
  • Installation of 2000A buss duct 480V
  • Installation of 112.5KVA transformers
  • Motor control equipment
  • Over 8,000 man hours

Internal Revenue Service Public bid

  • Turn key demolition of (2) 200HP motor generators and installed new UPS for the entire IRS facility
  • Installation of a 350KVA UPS unit
  • Removal of 150 batteries
  • Removal of (2) 200HP motor generator units
 

A Recent Letter from BGA Inc, A Consolidated Edison Company:

"Capital City Electrical Services Inc. successfully completed a lighting renovation project as subcontractor to BGA, Inc. for the United States Postal Service at its Processing and Distribution Centers located at Boggs Road and Crown Road in Duluth, GA and Atlanta, GA respectively. The work was completed without disruption to the USPS’s plant operations."

"Capital City Electrical Services Inc. performed the retrofit/replacement of the processing area lighting at both locations and further, installed a lighting control system. The work was completed on budget and by the deadline the customer had set. The construction value of the projects exceeded $1,000,000.00. The scope of work consisted of 2,000 light fixtures. The electrical work that was completed at these sites was done to code with no errors."

"In addition to following the Scope of Work and not missing a step, Capital City Electrical Services Inc. also cleaned the job site of all debris and ensured that all of the lamps were properly recycled with Southeast Recycling Technologies. The attention to detail and organization that Capital City Electrical Services commits itself to is commendable. I would recommend Capital City Electrical Services Inc. be strongly considered for any work of similar nature and will not hesitate to solicit their involvement again."

Best Regards,

Eric B. Lawton, PE, CGC
Vice President